Third-party verification against the EMC, Low Voltage and RoHS directives, with certificate numbers, the standards tested to, and the full model list each certificate covers. Test reports are downloadable.
Issued by Beide (Shenzhen) Product Service Limited. Click to open the full document.
B-E2210A3605
2014/30/EU · EN 61000-6-3, 61000-3-2, 61000-3-3, 61000-6-1
Issued 2022-10-26B-S2210A3606
2014/35/EU · EN 50525-1:2011
Issued 2022-10-27B-R2210A3607
2011/65/EU + (EU)2015/863 · EN IEC 63000:2018
Issued 2022-10-25The measurement data behind the certificates. A test report records what was measured; it does not carry a validity date.
| Document | Reference | Issued | Standard |
|---|---|---|---|
| EMC verification of conformity | B-E2210A3605 | 2022-10-26 | EN 61000-6-3 · EN IEC 61000-3-2 · EN 61000-3-3 · EN IEC 61000-6-1 |
| LVD verification of conformity | B-S2210A3606 | 2022-10-27 | EN 50525-1:2011 |
| RoHS 2.0 verification of conformity | B-R2210A3607 | 2022-10-25 | EN IEC 63000:2018 |
| EMC test report | B-E2210A3605 | 2022-10-26 | 38 pages |
| LVD test report | B-S2210A3606 | 2022-10-27 | 11 pages |
| RoHS 2.0 test report | B-R2210A3607 | 2022-10-25 | 7 pages |
| MSDS report | B-R2210A3608 | 2022-10-25 | 6 pages |
The certificates name the applicant address at the time of issue: Building 2, Lane 4880, Hunan Highway, Pudong New District, Shanghai. Manufacturing has since relocated to Zhangyan, Jinshan District, Shanghai, where the plant, equipment and process now operate. The company and the product scope covered are unchanged.
If your project documentation has to show the current manufacturing address, say so at enquiry stage and we will arrange re-issue or re-test against the standard the project is accepted under.
Every model listed on the certificates. Models with a trailing X cover any four-digit suffix from 0000 to 9999.
A construction outside this list is supplied with its own test schedule, agreed with the buyer before production. Tell us the standard the project is being accepted against and we quote to it.
Stranding, taping, extrusion and cabling in one plant — not an office with a catalogue.
Type tests establish a construction once. Routine tests are what catch a drift in the extrusion line on a Tuesday afternoon, so they run on every batch that leaves the plant.
| Test | Applied to |
|---|---|
| Conductor resistance | every batch |
| Insulation resistance | every batch |
| High-voltage withstand | every batch |
| Dimensional check — OD, wall thickness | every batch |
| Flex and bend cycle | construction type test |
| Oil, abrasion, low-temperature | construction type test |
Send the standard the project is accepted against and we return the documentation set.